Downey prices
Tile and slate prices in Downey, CA
Very few roofs need new tile. A great many need new underlayment under perfectly good tile.
Or call (562) 414-1955Your request is in.
We are matching it now against roofing contractors working in Downey and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
These are estimated ranges, not quotes. Compiled from public installed-cost data for California and adjusted for how Downey is built. No contractor is bound by them, and nobody can price a roof they have not stood on.
| Covering | Per square | Typical whole roof | Expected life |
|---|---|---|---|
| Architectural asphalt shingleThe default choice on most American homes, and usually the right one. | $650 – $950 | $11,500 – $28,500 | 25 to 30 years |
| Concrete tileThe tile lasts far longer than the underlayment beneath it, which is the catch. | $1,300 – $2,100 | $23,500 – $63,000 | 40 to 60 years |
| Clay barrel tileOften salvaged and re-laid over new underlayment rather than replaced. | $1,700 – $3,400 | $30,500 – $102,000 | 50 to 80 years |
What moves the price
- Whether the valleys, drip edge and step flashing are being replaced or reused
- Warranty tier, which is really a question about who honours it in fifteen years
- How many old layers have to come off before the new one goes on
- Permit and inspection fees, which vary more between towns than people expect
- Ventilation work, if the old roof was cooking itself from underneath
Locally
They also drive ember risk, which is why vent screening and Class A assemblies matter more here than the colour of the covering.
Expect a small percentage of breakage on any tile job. An honest quote says so and prices the replacements.
These are estimates, not quotes. They are compiled from national installed ranges adjusted for California costs and for how Downey is built. No contractor is bound by them.
Questions about price
What should I do to prepare?
Move the cars out, take pictures off the top-floor walls, cover anything stored in the attic, and put pets somewhere else for the loud days. Expect nails in the driveway however careful the crew is — ask whether they run a magnet at the end.
Should I repair or replace?
Rough rule: if the covering has more than about five years left and the damage is confined to one area, repair. If it is at the end of its life or you are patching the third leak in two years, you are paying instalments on a replacement.
Are you a roofing company?
No, and it matters that we say so. We are a referral service, not a contractor. The roofing work, the licence, the insurance and the warranty all sit with the independent company you choose.
Get it priced
Three questions, about a minute, and up to three Downey contractors come back to you.