What to ask before you sign anything

Ask all three contractors the same list. Comparing the answers is far more revealing than comparing the totals.

Or call (562) 414-1955
Guide7 sections1 min readDowney, CA

Get it looked at

Three questions, and up to three Downey contractors. Free either way.

Or call (562) 414-1955

Free · Up to three quotes

Get it looked at

Three questions, and up to three Downey contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

"What does your workmanship warranty cover, and for how long?"

Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.

"Can I see a job you finished five years ago?"

Recent work shows tidiness. Older work shows competence. Ask for the older one.

"What happens if the decking is rotten?"

The right answer is a specific price per sheet, written into the contract before work starts. A vague answer here is how a fixed price stops being fixed on day two.

"Who is actually doing the work?"

Ask how long this specific crew has worked together. Roofing companies keep their name and change their hands more often than most trades.

"What underlayment, and how are the valleys done?"

This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.

"What is your licence number, and who holds it?"

The follow-up matters more than the answer: does the entity on the licence match the entity on the paperwork, and is it active today?

In short

Six questions, three contractors, one afternoon. It is the cheapest insurance available on a job this size.

Related questions

Are the contractors licensed and insured?

We require a licence number and current insurance from every contractor in the network. Verify it yourself anyway. Your state licensing board has a free lookup, and it takes two minutes.

How much deposit is normal?

Ten to thirty per cent is ordinary, and is often used to order material. A demand for full payment up front is a reason to walk away.

What warranty should I expect?

Ask for both in writing: the material warranty from the manufacturer and the workmanship warranty from the contractor. The second one is the one that matters in year three, and it is only as good as the company behind it.

Get it priced

Three questions, about a minute, and up to three Downey contractors come back to you.